A palletizing cell may need to move products, collect an empty pallet and place layer or top sheets. Combining those functions in one end-of-arm tool can simplify some equipment arrangements. It also gives the robot additional tasks and changes the tool carried during every product movement. Compare the full cycle before deciding which functions should share a mechanism.

List the jobs before drawing the tool

Write the pallet-building sequence from the arrival of the empty pallet to the release of the completed load. Identify every product pickup, sheet placement and pallet-handling action, including the locations where each item is presented.

An example composite gripper can combine several handling functions, but a list of functions is not a verified design. Each needs a contact method, available space, a load case and confirmation of successful pickup and release.

Compare responsibilities and trade-offs

Shared tooling and separate handling devices
CheckOne composite toolSeparate devices
Robot tasksRobot performs the agreed product and auxiliary actionsSome auxiliary tasks move to dedicated mechanisms
Carried equipmentCombined tool mass stays with the robotProduct tool may carry fewer functions
TimingAuxiliary actions use robot timeSome actions may overlap if the sequence permits
LayoutRobot needs access to each supply positionAdditional equipment needs its own footprint and access
MaintenanceFunctions share one assemblyFunctions have separate maintenance and control interfaces

These are review questions, not a rule that one arrangement is faster or cheaper. The answer depends on the required rate, material variation and how the equipment fits into the available space.

Check the load cases individually

Collect the tool mass and centre-of-gravity information, then review product handling, empty-pallet handling and sheet handling as distinct cases. Product mass alone does not describe what the robot carries. Use the selected robot data to check permitted loads and movement conditions.

Also examine physical clearance. Pallet collection may need a different approach from product placement, while sheet pickup may need access to a magazine. The tool should not obstruct the highest layer, adjacent stacks or the required replenishment routes.

Put auxiliary actions into the timing model

For an illustrative pallet with ten layers and a sheet between each pair of layers, there are nine interlayer-sheet placements. A bottom sheet or top sheet adds separate actions if required. This is a counting example, not a production-rate estimate.

Include travel to the sheet supply, pickup confirmation, placement and the return to product handling. Then include empty-pallet supply and finished-load transfer. Compare total demand with the proposed equipment sequence rather than judging only the product-pick movement.

Plan replenishment and recovery

Pallet and sheet supplies need defined material conditions. Record dimensions and permitted variation, magazine arrangement, low-material detection and how replenishment is performed within the reviewed cell layout.

Describe the response to a missed or uncertain pickup. The system needs to distinguish the requested action from the confirmed state. A failed sheet pickup, an unavailable pallet and a product already held by the robot create different recovery situations and should not share an unexplained generic restart.

Ask for a sequence-based proposal

  • Product and packaging range, pallet conditions and layer patterns.
  • Sheet material, dimensions and placement requirements.
  • Required output with its counting units and included actions.
  • Layout, supply positions, replenishment and finished-load interface.

A useful comparison shows which device performs each task and which actions can overlap. That makes differences in tooling, controls and integration scope visible before selecting the arrangement.